Internet Future. Cisco Catalyst E Switch. All Laptop. Table of Contents. Cisco Catalyst Series Switches. Cisco Catalyst E switch. We provide you with the best quality content in the online industry. How to Choosing the right SMB switches? Site Map. Physical Dimensions. Rack Units RU. Chassis Only lbs. Fully Configured lbs. Input Voltage. UL Second Edition. EN Second Edition. IEC Second Edition. EN Class A. CE marking. ETS ETS Storage Class 1. ETS Transportation Class 2. Operating Environment.

Operating Temperature. Storage Temperature. Thermal Transition. Relative Humidity. Operating Altitude. Certified for operation: 0 to ft 0 to m. Designed and tested for operation: to 10, ft to m. To place an order, visit the Cisco ordering homepage. Table 3. Ordering Information.

Product Name. Part Number. Cisco Catalyst Enhanced Chassis. Cisco Catalyst Enhanced Chassis Spare. Cisco Catalyst Vertical Enhanced Chassis. Skip to content Skip to search Skip to footer. Step 2 Loosen the two screws that secure the uplink port cover plate to the supervisor engine faceplate and remove the cover plate. Save the cover plate for future use. Avoid cross-threading or overtightening the captive screws. Note For optical XENPAK transceivers, before removing the dust plugs and making any optical connections, observe the following guidelines:.

Step 8 Remove the dust plugs from the network interface cable SC connectors. Insert the other end of the network cable into a InfiniBand-compatible target device. Step 13 Observe the port status LED:. The Gigabit X2 transceiver can have either a spring-loaded latch sleeve or a latch sleeve that is not spring loaded. Both transceiver types are functionally identical. To install an X2 transceiver uplink port, follow these steps:.

Step 1 Using a small flat-blade screwdriver, carefully pry the X2 transceiver port cover off of the supervisor engine faceplate. Use the two arrows on the port cover as guides for inserting the screwdriver blade. Save the port cover for future use. Step 2 Remove the X2 transceiver from its protective packaging.

Note Do not remove the optical bore dust plugs until directed to do so later in the procedure. Step 3 Check the label on the X2 transceiver body to verify that you have the correct model for your network. Step 4 To install the X2 transceiver, do the following:. Insert the X2 transceiver into the transceiver socket on the supervisor engine faceplate.

See Figure , top view. Continue sliding the X2 transceiver into the socket until the X2 transceiver EMI gasket is flush against the system module faceplate. The X2 transceiver connector is now mated to the socket connector. Verify that the X2 transceiver latches are fully engaged and secure by sliding the transceiver latching sleeve toward the supervisor engine faceplate.

See Figure , bottom view. Figure Installing the Gigabit X2 Transceiver. Note Gigabit X2 transceivers are keyed to prevent incorrect insertion. Step 5 If you are cabling an optical X2 transceiver, perform the following substeps. If you are cabling a CX4 X2 transceiver, go to Step 6.

Remove the dust plugs from the optical network interface cable SC connectors. Remove the dust plugs from the X2 transceiver optical bores. Immediately attach the network interface cable SC connectors to the X2 transceiver. See Figure for cabling an optical X2 transceiver. Make sure that the InfiniBand cable connector is aligned with the X2 transceiver.

Step 7 Carefully route the InfiniBand network cable through the cable management brackets on your system. Figure shows how the Infiniband cable should be routed through either a horizontal cable management bracket or a vertical cable management bracket to provide adequate strain relief and support to prevent connector sag or skew.

Note Make sure that you route the InfiniBand cable through cable management brackets to provide adequate strain relief and cable support when cabling CX4 X2 transceivers. The InfiniBand cable is heavy. Without proper support, the InfiniBand cable can cause the cable connector to sag or skew. Misalignment between the cable connector and the transceiver connector can cause intermittent connections between the cable connector pins and the CX4 X2 transceiver pins.

Figure InfiniBand Cable Support. The optional cable management system on the Catalyst V-E switch chassis has the capacity to hold several hundred Catagory 5, 6, or 6a copper network interface cables or fiber-optic network interface cables. In order to maximize the capacity of this cable management system, observe the following guidelines:. If you are attaching and routing network interface cables on a Catalyst V-E switch chassis that has the cable management system installed, perform the following steps:.

Step 2 Pivot the front panel assembly up to disengage the front panel tab from the slot at the rear of the cable management assembly. This exposes the six cable guides allowing you to route the network interface cables. Set the front panel aside. Tip To keep the network interface cables organized and minimize the space they occupy, try bundling them in groups of 12 cables 4 bundles of 12 cables per port module.

Step 4 Repeat step 3 for the remainder of the network interface cables. After routing the remaining network interface cables through the cable management guides, you are ready to reinstall the cable management assembly front panel. Step 5 Position the front panel assembly and insert the front panel tab into the slot at the back of the cable guide system. Step 6 Pivot the front panel assembly down. Make sure that all of the network cables are properly routed, clear of the front panel and that none of them are being pinched.

Align the front panel so that you can start the two captive installation screws on the front panel. Step 7 Verify that the tab is still engaged in the slot on the back of the cable guide assembly and tighten the two captive installation screws on the front panel assembly. To verify the switch chassis installation, follow these steps:. Step 1 Verify that the ejector levers of each module are fully closed parallel to the faceplate to ensure that the supervisor engine and all switching modules are fully seated in the backplane connectors.

Step 2 Check the captive installation screws of each module, the power supply, and the fan assembly. Tighten any loose captive installation screws. Step 3 Verify that all empty module slots have blank faceplates installed and that the screws holding the plates in place are tight.

The blank faceplates optimize the air flow through the chassis and contain electromagnetic interference. Warning Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference EMI that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place.

Step 4 Turn on the power supply switches to power up the system. During the power-up sequence, the system performs a series of bootup diagnostic tests. Additional system diagnostic tests are available. These tests allow you to perform a complete sanity check on the system prior to inserting the system into your network and to monitor the health of the system while the system is running.

Tip When prestaging systems in a nonproduction environment, we recommend that you run all diagnostic tests, including the disruptive tests, to prescreen the systems for any failures. The Catalyst series systems running Cisco IOS have many levels of online diagnostic capabilities.

The online diagnostics are divided into four categories:. Skip to content Skip to search Skip to footer. Book Contents Book Contents. Find Matches in This Book. PDF - Complete Book Updated: January 19, Chapter: Installing the Switch. Installing the Switch Note In this publication, the term Catalyst series refers only to the switch chassis listed in Chapter 1.

Installing the switch All Catalyst series chassis can be rack-mounted. Connecting the chassis to system ground Construct and attach a system ground wire from the building earth ground to the system ground point on the chassis. Installing and cabling the power supply or supplies Normally, one power supply is shipped installed in the chassis.

Cabling the supervisor engine and modules to the network The various ports on the supervisor engine and on the modules that are installed in the chassis must be connected to the network. Powering up the chassis After completing the network cabling and making sure that system ground is connected, the power supplies can be turned on.

Statement Warning This unit is intended for installation in restricted access areas. Statement Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement Warning This product requires short-circuit overcurrent protection, to be provided as part of the building installation. Statement Warning During this procedure, wear grounding wrist straps to avoid ESD damage to the card.

Statement 94 Note If you are installing a freestanding not rack-mounted Catalyst NEB, Catalyst , or Catalyst E switch, you must install the stabilizer bracket kit, which is included as part of the accessory kit for these two switch chassis. Rack-Mounting Gu idelines The Catalyst series switches are designed to be installed in both open and enclosed racks. Before rack-mounting the switch, ensure that the equipment rack complies with the following guidelines: The width of the rack, measured between the two front-mounting strips or rails, must be The depth of the rack, measured between the front- and rear-mounting strips, must be at least The rack must have sufficient vertical clearance to insert the chassis.

These are the chassis heights: Catalyst Switch Chassis Height 7 inches Caution If the rack is on wheels, ensure that the brakes are engaged and that the rack is stabilized. Warning To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety: This unit should be mounted at the bottom of the rack if it is the only unit in the rack. When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.

If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack.

Statement Note To maintain proper air circulation through the Catalyst switch chassis, we recommend that you maintain a minimum 6-inch 15 cm separation between a wall and the chassis air intake or a wall and the chassis air exhaust. Unpacking the Switch Tip Do not discard the shipping container when you unpack the switch.

Verify that you received all listed equipment, which should include the following: — Optional equipment that you ordered, such as network interface cables, transceivers, or special connectors Check the modules in each slot.

Ensure that the configuration matches the packing list and that all of the specified interfaces are included. Blank power supply covers are shipped as part of the accessory kit. They are not installed on the chassis. Associated rack-mounting hardware is included in the accessory kit. Two 3-slot cable management guides are included in the accessory kit.

Catalyst E Standard inch L brackets factory-installed on the chassis. Two 4-slot cable management guides are included in the accessory kit. Catalyst and Catalyst E Standard inch rack-mount L brackets factory-installed on the chassis. Two 6-slot cable management guides are included in the accessory kit. Catalyst E only—Rubber feet installation kit is included in the accessory kit. The kit is used when installing the chassis as a freestanding unit on a table or shelf.

Two 9-slot cable management guides are included in the accessory kit. Stabilizer bracket installation kit is included in the accessory kit. The kit is required when installing the chassis as a freestanding unit. One cable management guide is included in the accessory kit. One 9-slot vertical chassis cable management system is included in the accessory kit.

Catalyst V-E Standard inch rack-mount L brackets factory-installed on the chassis. One cable management system is included in the accessory kit. Catalyst or Catalyst E Standard inch rack-mount L brackets factory-installed on the chassis. Two slot cable management guides are included in the accessory kit. Installing a Catalyst or Catalyst E Switch Chassis This section provides procedures for installing either a Catalyst or a Catalyst E switch chassis in a rack assembly and installing the optional cable guide assemblies.

Installation Accessory Kit The Catalyst and Catalyst E switch chassis are both designed to be installed in a standard inch rack, either open or enclosed, using inch rack-mount brackets that are factory installed on the left-front and right-front of the chassis.

Rack-Mount Brackets on the Catalyst and the Catalyst E Switch Chassis The Catalyst and the Catalyst E switch chassis are shipped with the two rack-mount brackets factory-installed on the front sides of the chassis. Statement Tip We recommend that you have a third person to assist in this procedure. To install the switch chassis into the equipment rack, follow these steps: Step 1 Determine the positioning of the chassis in the rack enclosure.

Perform the following substeps: a. Figure Removing the Catalyst E Chassis Shipping Bracket 1 Chassis shipping bracket 2 M5 Phillips-head screws 4x Step 3 With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance.

Figure Installing a Catalyst or Catalyst E Switch Chassis in a Rack What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground. Go to Chapter 4 for information on how to install and cable the PEMs and the power supplies.

Connecting the network interface cables to the supervisor engine and modules. This may involve installing transceivers before you attach the network interface cables. Powering-up the chassis and verifying the installation. Optional Installation Kits There are no optional installation kits available for either the Catalyst or the Catalyst E switch chassis. Installing a Catalyst E Switch Chassis This section provides procedures for installing a Catalyst E switch chassis in a rack assembly and installing the optional cable guide assemblies.

Installation Accessory Kit The Catalyst E switch chassis is designed to be installed in a standard inch rack, either open or enclosed. Figure Installing a Catalyst E Switch Chassis in a Rack What is Next After installing the chassis in its location, continue with the installation process by following these procedures: Connecting the chassis to system ground. Installing and connecting the power supplies to source power.

Go to Chapter 4 for information on how to install and cable power supplies. Optional Installation Kits There are no optional installation kits available for the Catalyst E switch chassis. Installation Accessory Kits The Catalyst and Catalyst E switch chassis are designed to be installed in a standard inch rack, either open or enclosed.

Depending on the chassis model, the accessory kit might also contain the following chassis installation kits: Rack-mount shelf kit Catalyst and Catalyst E. Rubber feet mount kit Catalyst E accessory kit only. This kit should installed when you want to install the Catalyst E chassis as a freestanding unit on a shelf or a table. Also included in the accessory kit: Two optional cable guides—The two cable guides are installed on the front left- and right-sides of the chassis using the same sets of screws either or that secure the chassis rack-mount L brackets to the rack posts.

Power supply blank panel—The power supply blank panel must be installed on an unused power supply bay to maintain chassis airflow and EMI shielding. L Brackets on the Catalyst and the Catalyst E Switch Chassis The Catalyst and the Catalyst E switch chassis are shipped with two L brackets installed on the front sides of the chassis. To install the switch chassis into the equipment rack, follow these steps: Step 1 With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance.

Figure Installing a Catalyst or a Catalyst E Switch in a Rack What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground. Optional Installation Kits An optional rubber feet installation kit is included in the accessory kit for the Catalyst E switch chassis.

This kit can be installed when you want to install the Catalyst E chassis as a freestanding unit on a shelf or a table. Also included in the accessory kit: Cable guides— Two cable guides can be installed on the front of the chassis using the same sets of screws that secure the chassis rack-mount brackets to the rack posts.

L Brackets on the Catalyst and Catalyst E Switches The Catalyst and Catalyst E switch chassis are shipped with two L brackets installed on the front sides of the chassis. To install the switch chassis in the equipment rack, follow these steps: Step 1 With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance. Figure Installing a Catalyst Switch or a Catalyst E Switch Chassis in a Rack What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground.

A stabilizer bracket kit Catalyst NEB only. If you are not installing the Catalyst NEB switch in a rack, you must install the stabilizer brackets to the bottom of the chassis. Also included in the Catalyst NEB accessory kit: One cable guide—The optional cable guide can be mounted to the front of the chassis. Also included in the Catalyst NEB-A accessory kit: Cable management system—The optional cable management kit can be installed on the upper front of the chassis.

To install the cable man agement system, perform these steps: Step 1 Place the cable management system against the chassis, as shown in Figure , and tighten the captive installation screws. Replacing the Ca ble Guide To replace the cable guides on the cable management system, perform these steps: Step 1 Loosen the two captive installation screws on the front panel. Figure Removing the Cable Guide Step 4 Install the standard cable guide to the back panel by securing the lip of the cable guide to the back panel.

Figure Front Panel Installation What is Next After installing the chassis in its location, complete the installation process by performing these procedures: Connecting the chassis to system ground.

Installing a Catalyst V-E Switch Chassis This section provides procedures for installing a Catalyst V-E switch chassis in a rack assembly and installing the optional cable guide system. Installation Accessory Kit The Catalyst V-E switch chassis is designed to be installed in a standard inch rack, either open or enclosed.

Also included in the Catalyst V-E switch accessory kit: Cable management system—The optional cable management system can be attached to the front of the chassis. Rack-Mounting the Chassis Tip We recommend that you have a third person to assist in this procedure. Caution For easier installation, the chassis should be empty when you install it in the rack.

Statement To install the switch chassis in the equipment rack, follow these steps: Step 1 With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the other hand near the back of the chassis for balance. Step 2 Position the chassis in the rack as follows: a. Figure Installing a Catalyst V-E Switch Chassis in a Rack 1 or rack-mounting screws 10x 2 Shelf bracket Installing the Cable Management System Optional The accessory kit for the Catalyst V-E switch chassis includes an optional cable management system that is installed on the front of the switch chassis.

To install the cable management system on the chassis, perform the following steps: Step 1 Remove the cable management assembly from the packing material. Figure Installing the Catalyst V-E Cable Management Assembly 1 Cable guide assembly 2 screws 4x 3 Attachment bracket Step 5 Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush against the chassis.

Figure Securing the Cable Management Assembly to the Front of the Chassis 1 Captive installation screws 2x What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground. Installing a Catalyst or Catalyst E Switch Chassis This section provides a procedure for installing either a Catalyst or Catalyst E switch chassis in a rack assembly and installing the optional cable guide assemblies.

Installation Accessory Kit The Catalyst and the Catalyst E switch chassis are designed to be installed in a standard inch rack either open or enclosed.

The accessory kit also contains the following chassis installation kits: A rack-mount shelf kit. A stabilizer bracket kit. If you are not installing the Catalyst or Catalyst E switch in a rack, you must install the stabilizer brackets to the bottom of the chassis. Also included in the accessory kit: Two optional cable guides—The two cable guides can be installed on the front left- and right-sides of the chassis using the same sets of screws either or that secure the chassis rack-mount L brackets to the rack posts.

L Brackets on the Catalyst and Catalyst E Switch Chassis The Catalyst and the Catalyst E switch chassis are shipped with the two L brackets installed on the front sides of the chassis. Figure Installing the Catalyst Switch Chassis in the Rack What is Next After installing the chassis in its location, complete the installation process by following these procedures: Connecting the chassis to system ground.

Optional Installation Kits An optional stabilizer bracket installation kit is included in the accessory kit for the Catalyst and the Catalyst E switch chassis. Generic Installation Procedures This section provides procedures covering how to install three installation kits that are included in multiple Catalyst series chassis accessory kits.

Crossbar bracket 1 Attaches between the two side rack-mount brackets to secure them together. M3 x 8 mm Phillips pan-head screw 2 Secures the crossbar bracket to the rack-mount side brackets. To install the shelf bracket and crossbar bracket , follow these steps: Step 1 Position one of the two shelf brackets in the rack as shown in Figure The rubber feet kit is shipped as part of the Catalyst series switch accessory kit with the following chassis: Catalyst E Catalyst E To install the rubber feet kit, perform the following steps: Step 1 Tilt the chassis to one side to access the bottom of the chassis.

Installing the Stabilizer Bracket Kit The stabilizer bracket kit is included as part of the accessory kits for the following chassis: Catalyst NEB switch Catalyst switch and Catalyst E switch If you are not installing the Catalyst NEB, Catalyst , or Catalyst E switch in a rack, you must install stabilizer brackets to the bottom of the chassis.

Table Stabilizer Kit Contents Quantity Part Description 16 M4 Phillips-head countersunk screws used to secure the stabilizer brackets to the chassis 2 Stabilizer brackets Note You will need the assistance of a second person to perform this installation. To install the stabilizer brackets, follow these steps: Step 1 Have one person tilt and hold the chassis to one side. Figure Installing the Stabilizer Brackets Note If you are not rack-mounting the Catalyst or the Catalyst E switch chassis and you want to install the optional cable guide assemblies, you must obtain ten or nuts.

Establishing the System Ground This section describes how to connect a system ground to the Catalyst series switches. Caution Installations that rely solely on system grounding using only an AC third-prong ground run a substantially greater risk of equipment problems and data corruption than those installations that use both the AC third-prong ground and a properly installed system NEBS compliant ground.

You must observe the following system grounding guidelines for your chassis: You must install the system NEBS ground connection with any other rack or system power ground connections that you make.

You must connect both the system NEBS ground connection and the power supply ground connection to an earth ground. If the Catalyst or Catalyst E chassis is powered up, you must power down the chassis before attaching the system NEBS ground. If you are installing the system NEBS ground on other models of the Catalyst series chassis that are equipped with either AC-input or DC-input power supplies, you do not need to power down the chassis.

The extended depth of the W power supply blocks access to the system ground pad on those chassis. There are two ground posts located on the power supply faceplate where the system ground connection can be made. Required Tools and Equipment To connect the system ground, you need the following tools and materials: Grounding lug—A two-hole standard barrel lug. Supports up to 6 AWG wire. Supplied as part of accessory kit.

Grounding screws—Two M4 x 8 mm metric pan-head screws. Supplied as part of the accessory kit. Grounding wire—Not supplied as part of accessory kit. The grounding wire should be sized according to local and national installation requirements. Commercially available 6 AWG wire is recommended. The length of the grounding wire depends on the proximity of the switch to proper grounding facilities.

Crimping tool to crimp the grounding wire to the grounding lug. Wire-stripping tool to remove the insulation from the grounding wire.